- ASD Knowledge Hub
- Agras T50 & T25
- Spreader
-
Agras T50 & T25
-
Agras T40 & T20P
-
Agras T30 & T10
-
General Agras Aircraft
-
Agras Spreader
-
Intelligent Flight Batteries
-
Intelligent Charging Station
-
D12000i
-
Swath Width Testing
-
Licensing, Regulations and Insurance
-
Warranty
-
Mavic 3
-
Pix4D Fields
-
DJI Smartfarm
-
DJI Terra
-
ASD AutoMixer
-
Trailers
-
DJI Relay
-
D-RTK Base Station
-
Dock 2
-
Matrice 30T
-
Agras T20
-
Website Tutorials
-
AirShocker
How To Install The Small Hopper Gate On The Dji Agras T50/T25 Spreading System
Objective
To replace the large gate with a small gate on the T-50 spreader in order to ensure proper seed distribution during spreading.
Key Steps
-
Remove the clip and thumb nut from the large gate.
-
Unclip the spinner disc and remove the clips around the edges.
-
Use a screwdriver to take out the small set screws holding the bracket in place.
-
Remove the snap ring using snap ring pliers.
-
Remove Large Hole hopper gate.
-
Insert and align the small gate with the notches on the servo arm to ensure proper alignment.
-
Install snap ring.
-
Install spinner disk bracket and tighten set screws to fix the bracket to spinner shaft.
-
Ensure all parts are securely in place.
-
Attach upper spinner skirt to spreader body.
-
Install spinner disk, washer, fixing nut and cotter pin. (Remember wing nut is reverse thread)
Cautionary Notes
-
Handle small parts carefully to avoid losing them.
-
Ensure proper alignment of the gates to prevent incorrect seed distribution.
-
Use tools such as pliers when necessary for easier handling of components.
Tips for Efficiency
-
Keep all small parts in a designated place to prevent misplacement.
-
Double-check the alignment of the gates before reassembling to avoid calibration issues.
-
Tighten components securely to prevent any loose parts during operation.